PIC/S PI 006-4, Recommendations on Qualification and Validation, entered into force on 1 October 2026. Section 3.4.3 says a validation master plan should contain information on topics (a) through (m). This page scores those thirteen topics and no others. Each topic label is quoted from that section. Quoted supporting sentences: 6. Paraphrased supporting sentences: 7. A paraphrase is marked on the row. It is not a quotation.
Section 3.1.1, paraphrased, says the plan should be risk-based and scientifically sound, and that it sets the manufacturer’s overall approach to qualification and validation. Section 3.4.1, paraphrased, says the VMP is a short summary: it should not repeat other documents, and it should include at least the information in §3.4.3 or point to policy documents, SOPs, protocols, and reports. Section 3.4.2, paraphrased, says management approves the VMP, and that it is reviewed and updated when facilities, supporting utilities, equipment, systems, or processes change. Those three sentences are context. They are not extra scored rows.
Percent complete is Present divided by Present + Partial + Missing, times 100, half-up to one decimal. N/A and blank rows are excluded. Partial is a gap and does not count as complete. The score is a planning tally. It is not an audit rating.
Planning aid only. Not a certified audit, not a site validation master plan, and not legal or regulatory advice. Confirm the current PIC/S PI 006-4 text.
Last checked 2026-11-06.
Worked example
Invented title VMP-DEMO-001. Eight topics are Present, two are Partial (organisational structure, and planning and scheduling), two are Missing (required SOPs, and deviation management), and specific process considerations is N/A. Applicable count is 12. Percent complete is 66.7 %. The N/A row is not in that denominator. Load example fills the same invented notes. Clear returns every row to Not assessed.
Related tools
Topic (l) is deviation management. Draft an investigation structure on the CAPA & 483 Response page. The CCS Gap Assessment page scores EU GMP Annex 1 contamination-control elements. The MACO / HBEL page calculates a cleaning limit from a PDE. This checklist does not score those other documents.
Sources
- PIC/S PI 006-4 Qualification and Validation — in force 1 Oct 2026; supersedes PI 006-3; §3.4.3 VMP topics (a)–(m); cleaning validation
FAQ
How is the VMP gap score calculated?
Percent complete is the count of Present divided by Present + Partial + Missing, then multiplied by 100 and rounded half-up to one decimal. N/A and blank rows are left out of that denominator. Partial is a gap. It does not count as complete. The thirteen topic labels are quoted from PIC/S PI 006-4 §3.4.3 (a)–(m), in force 1 October 2026. Short supporting sentences are quoted. Longer paragraphs are marked paraphrases. No topic is added beyond (a) through (m).
What should a validation master plan contain under PI 006-4?
Section 3.4.3 states: “A VMP should contain information on the following topics:” and then lists (a) Introduction through (m) Data Integrity. Section 3.4.1, paraphrased, says the VMP is a short summary and may point to other documents instead of repeating them. Section 3.4.2, paraphrased, says management approves it and that it is updated when facilities, supporting utilities, equipment, systems, or processes change.
Does Partial count as complete?
No. Partial stays in the denominator and is counted as a gap, together with Missing. Only Present counts toward the percent. N/A and rows left as Not assessed are excluded.
Is this checklist a site validation master plan?
No. It is a planning tally against the thirteen §3.4.3 topics. It is not a certified audit, not a controlled VMP, and not legal or regulatory advice. Confirm the current PIC/S PI 006-4 text.
Does this page upload my gap notes?
No. The score and the DOCX or XLSX export stay in the browser. Planning aid only. Not a certified audit, not a site validation master plan, and not legal or regulatory advice. Confirm the current PIC/S PI 006-4 text.